
Back
to New Build Up Page
Willow Oak
Pump and PTO installed

Body build-up in process. DS rear compartment
tack welded together
Driver side compartment assembly
Parts are sprayed with primer where material overlaps to prevent corrosion
Fabrication of body brackets and tank carrier
Front bumper assembly installation in progress
Center console assembly, installation, and
wiring in progress
Spring-mounts for body mounted on frame.
Spider frame at paint

Side compartment assemblies ready to be
painted before assembled on chassis
Spider frame installed on chassis
Two sides of the body are on the chassis
The rear compartment is installed
Tank with capacity of 500 gallons of water and
20 gallons of foam
Upper side compartments installed
Water tank installed

Passenger Side suction and discharges in vertical alignment
SCBA doors installed

Modular frame painted and installed

Discharge manifold for water/foam mixture
Rear discharge pipes painted and installed
Front bumper painted and installed

Front bumper discharge with accessible handle

Tow eyes painted and installed

Passenger side of modular notched for compartment
Compartment for passenger side modular notch
Lights installation in progress
Bostrom grey vinyl seats

Foam pump installation in
progress

Parts removal in progress
before paint
Pre-paint rear view

Pre-paint passenger's side front view

Under cab compartments
fabricated

Post-paint driver's side view
Post-paint passenger's side rear view
Plumbing painted red. Hoses
remain black
Plumbing under front bumper
painted red
Passenger side view of
completed Type 3
Driver side view of
completed Type 3
|